Please Don't Tread by the Pool

Cool-Deck Installation prep is underway and needs to stay clean


Please don't walk near the pool edges. They are being prepared for cool-decking installation.
Please don't walk near the pool edges. They are being prepared for cool-decking installation.

Pool perimeter tiles are installed and the cool decking company is prepping pool edges to install the cool decking. Please don't tread on the cleaned area so the project isn't delayed.


Once the cool decking is installed it takes seven days or so to cure enough for hoses to be dragged over it, which is needed for the next step: installing the mini-pebble covering over the entire pool bottom.


Once cured it will take one day to install the pebble tech. Another day or two to acid wash and polish the pebble tech. Then filling the pool can start, which could take two to three days. Once the pool is filled SWIMMING may begin. Then 14 days later the heater can be turned on.


So just a few weeks more and Los Lagos Vistas will have a brand new, clean pool!



 
 